CA Lic. #381378 | NV Lic. #0044714A
INDUSTRIAL REFRIGERATION | HVAC SERVICE | DESIGN | CONSTRUCTION
24-Hour Emergency Service 800 | 901-HVAC (4822)
CONSTRUCTION-REFRIGERATION

CASE STUDIES

An Unwavering Commitment Simply put, C&L Refrigeration's Construction Division exists solely to assist with the advancement of our customers' business objectives. Whether your company is looking to expand, update or retrofit existing infrastructure, or design and build an entirely new industrial refrigeration system from the ground up, look no further than C&L. With over 30 years of custom design, fabrication and installation experience we can quickly and precisely understand your specific goals, partner with you to tackle your system challenges, and provide turnkey results that satisfy your unique requirements. Here are a few examples of recently completed projects.

ICE II

  • Reduced energy costs by 75%
  • CO2 emissions reduced
  • 4 times storage at ½ the cost
  • Solar powered refrigeration
  • LEED facility Gold Rating

FONTANA DISTRIBUTION CENTER

  • 570,000 sq. ft dist. center
  • Energy efficient
  • Compressor VFD
  • Stainless steel evaporators
  • State-of-the-art control system

GOLDEN STATE FOODS

  • Ozone friendly refrigerant
  • Custom fabricated glycol tank
  • 3-way pneumatic mixing valve
  • 100% redundancy on system
  • Industrial quality chiller

2 SISTERS FOOD GROUP

  • State-of-the art processing facility
  • Compressor mounted VFD
  • Stainless steel evaporator coils
  • 53 evaporator and valve stations
  • Make up air units

WILD ROCKET FRESH FOODS

  • 116,000 Sq. ft. facility
  • VFD's on condensers & compressor
  • Flooded heat exchanger
  • 44 evaporator coils with VFD's
  • Thermosyphon oil cooling system

SYSCO NEWPORT MEAT CO

  • New central refrigeration system
  • VFD controlled evaporator condensers
  • 29 new evaporator coils
  • Upgraded electrical service
  • New refrigeration control system

GOLD STAR FOODS INC.

  • 117,000 SF Distribution Center
  • Ultra low-noise and energy efficient air units
  • "State of the Art" Refrigeration Control System
  • 100% steel piping to maximize reliability
  • Energy efficiency above state Title 24 energy requirements