print
C&L Refrigeration

Wild Rocket 116,000 sq. ft.
Ammonia Refrigerated Distribution Center Built by C&L Refrigeration

C&L Refrigeration completed a fast track main processing distribution center that stores and processes the fresh produce and juice products for TESCO's Fresh and Easy grocery stores along with other clients. Approximately 116,000 sq ft, the building contains an ammonia pumped recirculated system with multiple 35°F processing rooms, forty four (44) evaporators with variable speed drives and flooded heat exchangers for a glycol and a water processing system. The project also included outdoor make-up air handlers for room pressurization for a high care area, and 1,350HP of compressors with variable speed drives. This fast track project was completed in approximately three months with the large construction crew and welding team working in hot summer temperatures well over 100°F outside as well as in the attic areas. The center is fully operational and was completed on time for Wild Rocket in the fall of 2007.

 
    QUICK FACTS
  • Safety - ammonia detection system, ammonia emergency control box, ammonia diffusion tank, emergency pressure control system (EPCS), and automatic alarming and monitoring.
  • All uninsulated and insulated ammonia piping painted with a three-coat high quality epoxy paint system.
  • Screw compressors with variable speed drives for energy efficiency.
  • Evaporator coils with variable speed drives for energy efficiency.
  • Condenser fans with variable speed drives for energy efficiency.
  • Thermosyphon oil cooling system for the screw compressors.
  • Flooded stainless steel semi-welded plate and frame heat exchangers for the glycol and water process.
  • Oversized piping and vessels for future expansion capabilities.
  • Recirculator with hermetic pumps.
  • Refrigeration duty valves with stainless steel trims.
479 Nibus St. Brea, CA 92821 | 3840A Civic Center Dr. N. Las Vegas, NV 89030
(800) 901-HVAC (4822) ph (800) 901-4823 fx
CA Lic. #381378 | NV Lic. #0044714A